
What sets us apart.
Four manufacturing facilities, nearly 80 moulding machines and certified quality systems: the industrial depth behind every Furnastra component, from first drawing to final dispatch.
Built to make at industrial scale.
In-house blow and injection moulding across Maharashtra, with warehouses positioned to serve OEMs across India.
- 4Manufacturing facilities
- 22Injection moulding machines
- 57Blow moulding machines
- 36,000+Metric tons per annum
KHALAPUR, MAHARASHTRATARAPUR, MAHARASHTRA- Khalapur, Maharashtra
- Tarapur, Maharashtra
- Tarapur
- Delhi
- Hyderabad
Injection moulding
Hospital bed parts, plus pharma, automotive and auto-filter components.
- PE
- PP
- Filled PP
Blow moulding
Healthcare furniture parts alongside pharma, chemical, food and agrochemical products.
- HDPE
- PP
- Filled PP
Custom moulding
Components developed to an OEM's own drawings, from prototype mould to commercial production.
- HDPE
- PP
- Filled PP
Checked in-house, at every stage.
Quality is controlled inside our own plants: parts are tested while they are moulded and inspected again before they ship, under an integrated management system.
- Online testingParts are checked on the line, during moulding, not only at the end.
- Pre-dispatch inspection (PDI)Every consignment is inspected before it leaves the plant.
- CAPACorrective and preventive action closes the loop on any deviation.
- 5-S workplaceSort, set, shine, standardise, sustain — implemented on the shop floor.
- ISO 13485:2016Medical devices quality management
- ISO 9001:2015Quality management system
- ISO 45001:2018Occupational health & safety
- CEEuropean conformity
- Integrated management system per 21 CFR (US FDA) and EEC guidelines
- IEC 60601-2-52 (B2 bracket mechanism)
- 100% virgin raw material
Experts in every domain.
A team of specialists covering every step from concept to dispatch, with an in-house R&D department at its core.
Research & development
An in-house R&D department, including value creation by reverse engineering.Design & prototyping
From concept and out-of-the-box thinking to approved prototypes.Tooling
Prototype and production moulds developed for each new component.Production
Blow and injection moulding teams running 79 machines across four facilities.Quality assurance
Online testing, pre-dispatch inspection and CAPA on every order.Employee welfare
A stated core value: focusing on the welfare of the people who make our parts.
Cost cutting. Never corner cutting.
Quality consciousness is a core value at Mitsu Chem Plast. Every Furnastra part is moulded from 100% virgin raw material and passes through checks at each stage — because the components we make end up in hospital beds.
- 1Raw material100% virgin material, checked before moulding.
- 2Online testingParts tested on the line during production.
- 3Pre-dispatch inspectionEvery consignment inspected before shipping.
- 4CAPACorrective and preventive action on any deviation.
- 2022Fastest Product DevelopmentAward for Excellence in Plastic Industry — for Raksha 4 (M4)
- 2022Innovative DesignMedical Devices & Healthcare Equipment (SME) — M4 head & foot bow with CPR board
- 2024Sustainability Leader of the YearFICCI Awards 2024
- 2024Special Citation, CorporatesEnvirocare Green Awards 2024

